Addendum (Omitted Documents)
- 196.7KBAddendum (Omitted Documents) - Contents
- 2.8MBAppendix 2E RBSF Stage 3 Consultation Report
- 1.3MBAppendix 4D RBSF Stage 1 Report Site Selection Methodology
- 4.9MBAppendix 4E RBSF Stage 2 Report Identification of Potential Sites
- 7.3MBAppendix 4F RBSF Stage 3 Report Identification of Preferred Site
- 7.0MBAppendix A18.1 Part 2 Summary Report on Bathymetric and Geophysical Data
- 12.4MBAppendix A18.1 Part 3 Report on Geophysical Investigation for GDD Scheme Offshore Portmarnock
- 55.8MBAppendix A18.1 Part 4 Report on Geophysical Investigation for GDDP Portmarnock Golf Course
- 17.9MBAppendix A18.1 Part 5 Offshore Site Investigation of Outfall Pipeline
- 7.8MBAppendix A18.1 Part 6 Sub Bottom Analysis
- 18.4MBAppendix A18.1 Part 7 Hydrographic Survey Report
- 2.8MBAppendix A18.1 Part 8 Greater Dublin Drainage Scheme Fingal County Council TW_12_PRJ_007
- 16.7MBAppendix A18.1 Part 9 Preliminary Ground Investigation Contract Phase 1
- 17.1MBFigure 20.1 Location of Active Landfills in the Study Area
- 4.9MBFigure 21.1 Gas Transmission Infrastructure Location of Crossing Points
- 5.6MBFigure 21.2 Power Transmission Infrastructure Location of Crossing Points
- 5.6MBFigure 21.3 Railway Infrastructure Location of Crossing Points
- 591.2KBFigure 21.4 Dublin to Belfast Railway Proposed Trenchless Crossing
- 727.0KBFigure 21.5 N2 National Road Proposed Trenchless Crossing
- 705.1KBFigure 21.6 Collinstown Cross Proposed Trenchless Crossing
- 700.9KBFigure 21.7 M1 Motorway Proposed Trenchless Crossing
- 4.9MBFigure 21.8 Water Supply Infrastructure Crossing Points
- 5.1MBFigure 21.9 Watercourses Crossing Points
- 19.5MBFigure 21.10 Quarry Locations in Greater Dublin Region
- 645.5KBAppendix A11.1 Figure 2.1
- 617.6KBAppendix A11.1 Figure 2.2
Natura Impact Statement
Environmental Impact Assessment Report (EIAR)
- 312.5KBVolume 2 Part B Appendices Cover and Contents
- 731.3KBAppendix A2.1 Summary of Stakeholder Responses (2013)
- 438.6KBAppendix A2.2 Summary of Stakeholder Responses (2018)
- 7.2MBAppendix A3.1 Assessment of Domestic and Non-Domestic Load
- 2.2MBAppendix A4.1 Key Wastewater Treatment Standards Report
- 52.3MBAppendix A4.2 Engineering Specialist Report for Crossings
- 1.5MBAppendix A5.1 Assessment of Potential for Reuse of Treated Wastewater
- 1.3MBVolume 3 Part A Cover, Contents, Preface and Glossary
- 1.6MBChapter 6 Population
- 1.5MBChapter 7 Human Health
- 11.2MBChapter 8 Marine Water Quality
- 1.9MBChapter 9 Biodiversity (Marine)
- 2.2MBChapter 10 Biodiversity (Marine Ornithology)
- 3.9MBChapter 11 Biodiversity (Terrestrial and Freshwater Aquatic)
- 2.2MBChapter 12 Landscape and Visual
- 2.1MBChapter 13 Traffic and Transport
- 3.0MBChapter 14 Air Quality, Odour and Climate
- 2.8MBChapter 15 Noise and Vibration
- 2.0MBChapter 16 Archaeological, Architectural and Cultural Heritage
- 827.1KBChapter 17 Hydrology and Hydrogeology
- 1.6MBChapter 18 Soils and Geology
- 1.0MBChapter 19 Agronomy
- 1.4MBChapter 20 Waste
- 1.3MBChapter 21 Material Assets
- 485.7KBChapter 22 Risk of Major Accidents and/or Disasters
- 646.5KBChapter 23 Cumulative Impacts and Environmental Interactions
- 1.9MBChapter 24 Summary of Mitigation Measures
- 329.8KBChapter 25 Summary of Residual Impacts
- 239.2KBVolume 3 Part B Cover and Contents
- 107.0KBAppendix A6.1 Residential Settlements within the Proposed Project Study Area
- 592.9KBAppendix A6.2 Relevant Local Area Plans
- 2.3MBAppendix A8.1 Model Development and Calibration
- 18.8MBAppendix A9.1 Marine Ecology Reports
- 2.9MBAppendix A9.2 Marine Mammal Survey Investigation
- 5.8MBAppendix A9.3 Underwater Noise Assessment and Modelling
- 4.1MBAppendix A10.1 Estuarine Ornithological Surveys
- 1.7MBAppendix A10.2 Vessel Management Plan
- 1.7MBAppendix A11.1 Bat Survey and Assessment 2017
- 577.3KBAppendix A11.2 Botanical Survey at Portmarnock
- 3.4MBAppendix A11.3 Ecological Survey for Smooth Newt
- 380.2KBAppendix A12.1 Operational Phase Visual Impact Appraisal at Representative View Points
- 337.6KBAppendix A13.1 Scoping Documentation
- 378.9KBAppendix A13.2 Traffic Calculations
- 225.0KBAppendix A13.3 Construction Programme
- 1.6MBAppendix A13.4 Count Data
- 5.3MBAppendix A13.5 Junction 9 Outputs
- 916.5KBAppendix A13.6 Road Safety Audit
- 119.0KBAppendix A14.1 Construction Dust Assessment
- 3.2MBAppendix A14.2 Baseline Ambient Air Quality Report 2017
- 1.5MBAppendix A14.3 Baseline Ambient Air Quality Report 2016
- 257.8KBAppendix A14.4 Estimation of Emission Rates from the Proposed Abbotstown Pumping Station and Wastewater Treatment Plant
- 160.4KBAppendix A14.5 Detailed Dispersion Modelling Predictions
- 84.1KBAppendix A14.6 Mitigation Measures and Abatement Options
- 141.4KBAppendix A15.1 Glossary of Noise Terms
- 6.4MBAppendix A15.2 Detailed Baseline Noise Monitoring Report
- 98.2KBAppendix A15.3 Connolly Hospital Baseline Vibration Monitoring Results
- 108.0KBAppendix A15.4 Assumed Activity for the Proposed Wastewater Treatment Plant Operational Phase
- 476.5KBAppendix A16.1 Recorded Archaeological Heritage Sites Within the Receiving Environment
- 302.4KBAppendix A16.2 Recorded Shipwrecks Within the Receiving Environment
- 156.7KBAppendix A16.3 Stray Archaeological Finds Recorded Within the Receiving Environment
- 423.4KBAppendix A16.4 Recorded Built Heritage Sites Within the Receiving Environment
- 337.4KBAppendix A16.5 Areas of Archaeological Potential Identified Within the Receiving Environment
- 253.6KBAppendix A16.6 Designed Landscapes Located Within the Receiving Environment
- 269.7KBAppendix A16.7 Unrecorded Built Heritage Sites Identified Within the Receiving Environment
- 236.0KBAppendix A16.8 Townland Boundaries to be Crossed by the Proposed Project
- 247.4KBAppendix A16.9 Archaeological Geophysical Surveys Undertaken as Part of the Environmental Impact Assessment Part A
- 2.3MBAppendix A16.9 Archaeological Geophysical Surveys Undertaken as Part of the Environmental Impact Assessment Part B
- 6.4MBAppendix A16.9 Archaeological Geophysical Surveys Undertaken as Part of the Environmental Impact Assessment Part C
- 7.3MBAppendix A16.9 Archaeological Geophysical Surveys Undertaken as Part of the Environmental Impact Assessment Part D
- 5.2MBAppendix A16.9 Archaeological Geophysical Surveys Undertaken as Part of the Environmental Impact Assessment Part E
- 4.6MBAppendix A16.9 Archaeological Geophysical Surveys Undertaken as Part of the Environmental Impact Assessment Part F
- 5.8MBAppendix A16.9 Archaeological Geophysical Surveys Undertaken as Part of the Environmental Impact Assessment Part G
- 1.4MBAppendix A16.9 Archaeological Geophysical Surveys Undertaken as Part of the Environmental Impact Assessment Part H
- 7.3MBAppendix A16.9 Archaeological Geophysical Surveys Undertaken as Part of the Environmental Impact Assessment Part I
- 2.5MBAppendix A16.9 Archaeological Geophysical Surveys Undertaken as Part of the Environmental Impact Assessment Part J
- 10.3MBAppendix A16.10 Archaeological Testing Undertaken as Part of the Environmental Impact Assessment
- 2.6MBAppendix A16.11 Intertidal Archaeological Survey Undertaken as Part of the Environmental Impact Assessment
- 8.5MBAppendix A16.12 Marine Archaeological Geophysical Survey Undertaken as Part of the Environmental Impact Assessment
- 3.0MBAppendix A16.13 Marine Archaeological Dive Survey Undertaken as Part of the Environmental Impact Assessment
- 39.3MBAppendix A17.1 Flood Risk Assessment Report
- 241.1KBAppendix A17.2 Groundwater Well Survey Questionnaire Summary
- 28.8MBAppendix A17.3 Site Investigation Borehole Locations and Report
- 211.7KBAppendix A17.4 Groundwater Quality Analyses Results
- 4.3MBAppendix A18.1 Ground Investigation Factual Reports Part A
- 3.4MBAppendix A18.1 Ground Investigation Factual Reports Part B
- 1.6MBAppendix A18.1 Ground Investigation Factual Reports Part C
- 1.3MBAppendix A18.1 Ground Investigation Factual Reports Part D
- 5.9MBAppendix A18.1 Ground Investigation Factual Reports Part E
- 5.2MBAppendix A18.1 Ground Investigation Factual Reports Part F
- 5.8MBAppendix A18.1 Ground Investigation Factual Reports Part G
- 1.2MBAppendix A18.1 Ground Investigation Factual Reports Part H
- 2.5MBAppendix A18.1 Ground Investigation Factual Reports Part I
- 5.6MBAppendix A18.2 Ground Investigation Location Drawings
- 195.5KBAppendix A19.1 Landowner Impact Assessment Table
- 233.5KBVolume 4 Part B Cover and Contents
- 114.7KBAppendix 3A RBSF Receptors List
- 120.3KBAppendix 6A Criteria for Ecological Evaluation
- 313.2KBAppendix 7A Waste Management Plan RBSF
- 133.7KBAppendix 8A Ambient Air Quality Standards
- 127.7KBAppendix 8B Dust Minimisation Plan
- 201.8KBAppendix 9A Glossary of Acoustic Terminology
- 155.3KBAppendix 9B Construction Noise and Vibration Mitigation
- 1.8MBAppendix 10A Sensitivity Assessment - Odour Contours
- 120.3KBAppendix 11A Record Monuments in the Study Area
- 105.9KBAppendix 11B Sites in the Sites of Monument Record
- 139.9KBAppendix 11C Archaeological Investigations Carried out in the Study Area
- 4.1MBAppendix 14A Photomontages
- 35.4MBAppendix 14B Glint and Glare Assessment
- 1.0MBAppendix 17A Outline Construction Environmental Management Plan
- 459.5KBVolume 5 Part A Cover and Contents
- 5.0MBFigure 3.1 Contributing Catchments of Existing Wastewater Treatment Plants
- 970.3KBFigure 3.2 Critical Catchments
- 4.9MBFigure 3.3 Potential Secondary Catchments
- 2.1MBFigure 4.1 Proposed Project Overview
- 2.1MBFigure 4.2 Designated Areas in the Vicinity of the Proposed Project
- 1.6MBFigure 4.3 Proposed Wastewater Treatment Plant Site
- 1.0MBFigure 4.4 Land Use Zoning Objectives at the Proposed Wastewater Treatment Plant Site
- 827.7KBFigure 4.5 Zonal Arrangement of the Proposed Wastewater Treatment Plant
- 738.5KBFigure 4.6 Typical Detail of the Proposed Pipeline Route Construction Corridor
- 2.3MBFigure 4.7 Typical Arrangement for Proposed Microtunnelling Compound
- 1.0MBFigure 4.8 Typical Cross Section of the Proposed Pipe line Route Trench Dredged in the Seabed
- 2.7MBFigure 6.1 Study Area Proposed Wastewater Treatment Plant
- 2.6MBFigure 6.2 Study Area for Proposed Orbital Sewer Route, Outfall Pipeline Route and Abbotstown Pumping Station
- 2.3MBFigure 6.3 Residential Buildings within the Proposed Project Study Area
- 2.7MBFigure 6.4 Land Use Zonings within the Proposed Project Study Area
- 2.3MBFigure 6.5 Residential Zoned Lands within the Proposed Project Study Area
- 2.7MBFigure 6.6 Economic Activity within the Proposed Project Study Area
- 3.2MBFigure 6.7 Commercial Clusters within the Proposed Project Study Area
- 2.3MBFigure 6.8 Healthcare Facilities within the Proposed Project Study Area
- 2.3MBFigure 6.9 Primary and Secondary Level Schools within the Proposed Project Study Area
- 2.8MBFigure 6.10 Tourism, Public Amenities, Sporting and Community Infrastructure
- 8.1MBFigure 8.1 Coastal and Transitional Waterbodies
- 8.3MBFigure 8.2 Designated Areas
- 8.3MBFigure 8.3 Model mesh and Bathymetry
- 4.6MBFigure 8.4 High Resolution Mesh
- 8.0MBFigure 8.5 Calibration Locations
- 7.3MBFigure 8.6 Vibrocore and Borehole Locations
- 8.1MBFigure 8.7 Modelled Rivers and Hydrometric Stations
- 8.0MBFigure 8.8 Wastewater Treatment Plant Outfall Locations
- 7.3MBFigure 8.9 Modelled Rivers and Quality Stations
- 7.3MBFigure 8.10 Marine Sampling Stations
- 7.3MBFigure 8.11 Ecological Status
- 7.3MBFigure 8.12 Quality of Bathing Waters
- 7.3MBFigure 8.13 Trophic Status
- 2.2MBFigure 9.1 Summary of Field Survey Operations for the Proposed Outfall Pipeline Route
- 1.5MBFigure 9.2 Summary of Bathymetry Data for the Proposed Outfall Pipeline Route
- 1.9MBFigure 9.3 Sediment Changes near the Proposed Outfall Pipeline Route and Diffuser Location
- 2.3MBFigure 9.4 Casual Sightings and Dedicated Surveys of the Harbour Porpoise
- 1.8MBFigure 9.5 Inshore Shelfish Grounds along the Fingal Coast
- 1.8MBFigure 9.6 Maximum Suspended Sediment Plume Concentrations arising from dredging over the duration of the dredging works for the proposed outfall pipeline route
- 2.6MBFigure 10.1 Location and Extent of Marine, Coastal and Estuarine Ornithological Surveys
- 1.9MBFigure 10.2 Bird Distribution Compound No.9
- 1.9MBFigure 10.3 Bird Distribution Compound No.10
- 766.1KBFigure 10.4 Distribution of Feeding Guillemot Records
- 764.8KBFigure 10.5 Distribution of Non-Feeding Guillemot Records
- 766.0KBFigure 10.6 Distribution of Feeding Razorbill Records
- 765.0KBFigure 10.7 Distribution of Non-Feeding Razorbill Records
- 4.3MBFigure 11.1 Special Areas of Conservation
- 4.8MBFigure 11.2 Special Protection Areas & RAMSAR Sites
- 5.0MBFigure 11.3 Natural Heritage Areas
- 2.2MBFigure 11.4 Dublin Bay UNESCO Biosphere Reserve
- 2.3MBFigure 11.5 Habitat Survey (1 of 6)
- 1.6MBFigure 11.5 Habitat Survey (2 of 6)
- 2.1MBFigure 11.5 Habitat Survey (3 of 6)
- 1.9MBFigure 11.5 Habitat Survey (4 of 6)
- 1.8MBFigure 11.5 Habitat Survey (5 of 6)
- 1.4MBFigure 11.5 Habitat Survey (6 of 6)
- 2.2MBFigure 11.7 Freshwater Sampling Locations
- 2.7MBFigure 12.1 Landscape and Visual Impact Assessment Study Area
- 732.4KBFigure 12.2 Zone of Theoretical Visibility for the Proposed Wastewater Treatment Plant
- 685.7KBFigure 12.3 Viewpoint Locations Map
- 2.8MBFigure 12.4 Landscape and Visual Mitigation Concept
- 732.7KBFigure 12.5 Proposed Wastewater Treatment Plant Landscape Mitigation Plan
- 20.3MBFigure 12.6 Proposed Abbotstown Pumping Station
- 9.7MBFigure 13.1 Traffic Assessment Locations
- 7.7MBFigure 13.2 Proposed Construction Corridor (1 of 3)
- 10.1MBFigure 13.2 Proposed Construction Corridor (2 of 3)
- 12.9MBFigure 13.2 Proposed Construction Corridor (3 of 3)
- 337.9KBFigure 13.3 Proposed Left-Turn Site Access Junction on R139 Road
- 312.8KBFigure 13.4 Proposed Left-Turn Site Exit on Clonshaugh Road
- 261.6KBFigure 13.5 Autotrack Analysis – Max Regulated Articulated Vehicle
- 1.5MBFigure 14.1 Study Area for the Construction Phase Air Quality Impact Assessment (1 of 2)
- 1.5MBFigure 14.1 Study Area for the Construction Phase Air Quality Impact Assessment (2 of 2)
- 4.5MBFigure 14.2 Study Area for the Operational Phase of the Air Quality Impact Assessment
- 2.1MBFigure 14.3 Air Quality Monitoring Locations (1 of 3)
- 1.8MBFigure 14.3 Air Quality Monitoring Locations (2 of 3)
- 1.7MBFigure 14.3 Air Quality Monitoring Locations (3 of 3)
- 1.5MBFigure 14.4 Receptor Locations (1 of 9)
- 1.4MBFigure 14.4 Receptor Locations (2 of 9)
- 1.2MBFigure 14.4 Receptor Locations (3 of 9)
- 1.5MBFigure 14.4 Receptor Locations (4 of 9)
- 1.6MBFigure 14.4 Receptor Locations (5 of 9)
- 1.3MBFigure 14.4 Receptor Locations (6 of 9)
- 1.3MBFigure 14.4 Receptor Locations (7 of 9)
- 987.5KBFigure 14.4 Receptor Locations (8 of 9)
- 1.0MBFigure 14.4 Receptor Locations (9 of 9)
- 542.3KBFigure 14.5 Isopleth Showing Odour Predictions
- 544.7KBFigure 14.6 Isopleth Showing Odour Predictions - 1 Hour
- 543.1KBFigure 14.7 Proposed Abbotstown Pumping Station Concentration PM10
- 546.3KBFigure 14.8 Proposed Abbotstown Pumping Station Annual Mean PM10
- 539.4KBFigure 14.9 Proposed Abbotstown Pumping Station Annual Mean PM2.5
- 553.0KBFigure 14.10 Proposed Abbotstown Pumping Station Concentration CO
- 540.5KBFigure 14.11 Proposed Abbotstown Pumping Station Concentration 1 Hr SO2
- 540.6KBFigure 14.12 Proposed Abbotstown Pumping Station Concentration 24 Hr SO2
- 538.7KBFigure 14.13 Proposed Abbotstown Pumping Station Annual Mean SO2
- 538.9KBFigure 14.14 Proposed Abbotstown Pumping Station Concentration NO2
- 537.3KBFigure 14.15 Proposed Abbotstown Pumping Station Annual Mean NO2
- 532.7KBFigure 14.16 Proposed Abbotstown Pumping Station Concentration Nox
- 371.0KBFigure 14.17 Isopleth Showing Odour Predictions Normal Operating Conditions
- 368.4KBFigure 14.18 Isopleth Showing Odour Predictions Peak Operating Conditions
- 416.8KBFigure 14.19 Proposed Wastewater Treatment Plant PM10
- 509.9KBFigure 14.20 Proposed Wastewater Treatment Plant Annual Mean PM10
- 416.5KBFigure 14.21 Proposed Wastewater Treatment Plant Annual Mean PM2.5
- 476.5KBFigure 14.22 Proposed Wastewater Treatment Plant Rolling Mean CO
- 479.5KBFigure 14.23 Proposed Wastewater Treatment Plant 1 Hr SO2
- 478.4KBFigure 14.24 Proposed Wastewater Treatment Plant 24 Hr SO2
- 471.4KBFigure 14.25 Proposed Wastewater Treatment Plant Annual Mean SO2
- 478.9KBFigure 14.26 Proposed Wastewater Treatment Plant NO2
- 473.9KBFigure 14.27 Proposed Wastewater Treatment Plant Annunal Mean NO2
- 409.3KBFigure 14.28 Proposed Wastewater Treatment Plant Annual Mean Nox
- 415.7KBFigure 14.29 Isopleth Showing Odour Predictions Normal Conditions
- 415.8KBFigure 14.30 Isopleth Showing Odour Predictions Peak Conditions
- 1.4MBFigure 15.1 Noise Monitoring Locations (1 of 5)
- 1.6MBFigure 15.1 Noise Monitoring Locations (2 of 5)
- 1.5MBFigure 15.1 Noise Monitoring Locations (3 of 5)
- 1.3MBFigure 15.1 Noise Monitoring Locations (4 of 5)
- 1.1MBFigure 15.1 Noise Monitoring Locations (5 of 5)
- 2.1MBFigure 15.2 Vibration Monitoring Locations at Connolly Hospital
- 1.7MBFigure 15.3 Noise Sensitive Receptor Locations (1 of 6)
- 1.6MBFigure 15.3 Noise Sensitive Receptor Locations (2 of 6)
- 1.5MBFigure 15.3 Noise Sensitive Receptor Locations (3 of 6)
- 1.5MBFigure 15.3 Noise Sensitive Receptor Locations (4 of 6)
- 1.3MBFigure 15.3 Noise Sensitive Receptor Locations (5 of 6)
- 1.3MBFigure 15.3 Noise Sensitive Receptor Locations (6 of 6)
- 1.3MBFigure 15.4 Calculated Noise Contours for the Proposed Wastewater Treatment Plant Operational Phase (Daytime)
- 799.9KBFigure 15.5 Calculated Noise Contours for the Proposed Wastewater Treatment Plant Operational Phase (Evening Time)
- 1.1MBFigure 15.6 Calculated Noise Contours for the Proposed Wastewater Treatment Plant Operational Phase (Night-time)
- 872.6KBFigure 15.7 Calculated Noise Contours for the Proposed Abbotstown Pumping Station Operational Phase
- 979.9KBFigure 15.8 Calculated Noise Contours for the Proposed Dubber Odour Control Unit Operational Phase
- 2.5MBFigure 16.1 Proposed Project (Blanchardstown) Showing Surrounding Sites of Cultural Heritage Significance
- 2.1MBFigure 16.2 Proposed Project (M50 Junction 5)Showing Surrounding Sites of Cultural Heritage Significance
- 1.9MBFigure 16.3 Proposed Project (Silloge) Showing Surrounding Sites of Cultural Heritage Significance
- 2.0MBFigure 16.4 Proposed Project (Clonshagh) Showing Surrounding Sites of Cultural Heritage Significance
- 2.2MBFigure 16.5 Proposed Project (St Doolaghs) Showing Surrounding Sites of Cultural Heritage Significance
- 3.7MBFigure 16.6 Proposed Project (Baldoyle Estuary Nature Reserve) Showing Surrounding Sites of Cultural Heritage Significance
- 5.1MBFigure 17.1 Proposed Project Overview
- 1.9MBFigure 17.2 Groundwater Supply Well
- 4.9MBFigure 17.3 Hydrological Study Area
- 2.0MBFigure 17.4 Bedrock Geology
- 2.0MBFigure 17.5 Aquifer Classification
- 2.5MBFigure 17.6 Groundwater Vulnerability
- 2.4MBFigure 17.7 Soils
- 2.5MBFigure 17.8 Groundwater Supply Wells
- 1.2MBFigure 17.9 Portmarnock Golf Club Irrigation Wells
- 6.3MBFigure 17.10 Proposed Watercourse Crossings
- 1.7MBFigure 17.11 Boreholes at Clonshagh
- 769.1KBFigure 17.12 Site Investigation Boreholes
- 2.4MBFigure 18.1 Teagasc Subsoils Blanchardstown to Clonshagh (1 of 3)
- 2.7MBFigure 18.1 Teagasc Subsoils Blanchardstown to Clonshagh (2 of 3)
- 3.4MBFigure 18.1 Teagasc Subsoils Portmarnock to Proposed Marine Outfall (3 of 3)
- 2.5MBFigure 18.2 Bedrock Geology Blanchardstown to Clonshagh (1 of 3)
- 2.8MBFigure 18.2 Bedrock Geology Blanchardstown to Clonshagh (2 of 3)
- 3.2MBFigure 18.2 Bedrock Geology Portmarnock to Proposed Marine Outfall (3 of 3)
- 2.4MBFigure 18.3 Route Constraints Blanchardstown to Clonshagh (1 of 3)
- 3.2MBFigure 18.3 Route Constraints Blanchardstown to Clonshagh (2 of 3)
- 3.6MBFigure 18.3 Route Constraints Portmarnock to Proposed Marine Outfall (3 of 3)
- 2.3MBFigure 18.4 Site Investigation Blanchardstown to Clonshagh (1 of 3)
- 2.7MBFigure 18.4 Site Investigation Blanchardstown to Clonshagh (2 of 3)
- 3.5MBFigure 18.4 Site Investigation Portmarnock to Proposed Marine Outfall (3 of 3)
- 1.5MBFigure 19.1 Agricultural Land Parcels (1 of 6)
- 1.5MBFigure 19.2 Agricultural Land Parcels (2 of 6)
- 1.4MBFigure 19.3 Agricultural Land Parcels (3 of 6)
- 1.4MBFigure 19.4 Agricultural Land Parcels (4 of 6)
- 1.2MBFigure 19.5 Agricultural Land Parcels (5 of 6)
- 1.2MBFigure 19.6 Agricultural Land Parcels (6 of 6)
- 6.2MBFigure 23.1 Other Developments Considered
- 354.3KB Volume 5 Part B Cover and Contents
- 14.8MB Y17702-PL-001-General Site Location Plan
- 1.0MB Y17702-PL-002-Site Location Map
- 697.4KB Y17702-PL-003-Existing Site Layout
- 6.3MB Y17702-PL-004-Proposed Site Layout
- 1.9MB Y17702-PL-005-Existing Buildings to be Demolished - Elevations and Plans
- 677.8KB Y17702-PL-006-Proposed Ancillary Buildings-Elevations, Plans and Typical Cross Sections
- 590.5KB Y17702-PL-007-Storage Building A - Roof Plan and Elevations
- 1.1MB Y17702-PL-008-Storage Building A-Plans and Cross Sections
- 586.1KB Y17702-PL-009-Storage Building B - Roof Plan and Elevations
- 1.1MB Y17702-PL-010-Storage Building B - Plans and Cross Sections
- 7.1MB Y17702-PL-011-Landscape Layout
- 4.1MB Y17702-PL-012-Continguous Elevations
- 5.0MB Y17702-PL-013-Proposed Road Layout and Markings
- 3.4MB Y17702-PL-014-Junction Layout, Lamp Standard and Typical Road Details
- 9.8MB Y17702-PL-015-Surface Water Drainage Layout
- 1.6MB Y17702-PL-016-Surface Water Drainage-Typical Details
- 5.1MB Y17702-PL-017-Foul Drainage Layout
- 616.1KB Y17702-PL-018-Existing Foul Pumping Station-Pland and Section
- 2.6MB Y17702-PL-019-Manhole, Trench Backfill and Bedding-Typical Details
- 9.1MB Y17702-PL-020-Watermain Layout
- 5.5MB Y17702-PL-021-Watermain Typical Details
- 819.4KB Y17702-PL-022-Odour Control Unit-Plan and Elevation
- 5.1MB Y17702-PL-023-Electricity and External Lighting Layout
- 820.3KB Y17702-PL-024-Site Development Details
- 548.8KB Y17702-PL-025-Weighbridge Details and ME Control Building
- 633.7KB Y17702-PL-026-Construction and Permenant Information Sign
- 5.3MB Y17702-PL-027-Proposed Site Layout Overlaid with Services