Publications and Consultation
Project Reports
- Final Option Appraisal Report - Non Technical Summary (November 2016)
- Final Option Appraisal Report - Full Report (November 2016)
- Executive Summary
- Introduction
- Remaining Viable Options
- Preliminary Options Appraisal Report (POAR) - Public Consultation
- Interim Demand Review and Phasing of Supply
- Source Abstraction Regime
- Appraisal of Source Impact
- Economic Appraisal
- Preferred Scheme
- Community Benefit Opportunities
- Preferred Scheme - Infrastructure Sites
- Preferred Scheme - Transmission Pipeline
- Concluding Statement
- Next Step
- Schedule of Drawings
- Appendix A Interim Midlands and GDA Water Resource Plan
- Appendix B Hydrodynamic and Water Quality Modelling Report
- Appendix C Cost-Benefit Analysis of Water Supply Projects for the Eastern and Midlands Region
- Appendix D Review of Treatment Technology
- Appendix E Raw Water Abstraction
- Appendix F Water Treatment Plant
- Appendix G Break Pressure Tank
- Appendix H Termination Point Reservoir
- Appendix I Transmission Pipeline
- Appendix J Preliminary Options Appraisal - Consultation Submissions Report
- Water Supply Project E Kennedy Response Summary
- Response to the December 2016 Submission from Emma Kennedy
- Preliminary Options Appraisal Report - Non Technical Summary (November 2015)
- Vol 1 Preliminary Options Appraisal Report - Full Report (updated August 2016 to correct mapping error)
- Vol 2 Appendix A, B, C, D
- Vol 3 Appendix E
- Vol 4 Appendix F
- Vol 5 Appendix G
- Vol 6 Appendix H
- Least Constrained Corridor Mapping - Discovery series
- Water Supply Options Working Paper Non-Technical Summary (June 2015)
- Water Supply Options Working Paper (June 2015)
- Appendix A - Response to Feedback from the Project Need Report Consultation
- Appendix B - Source Yield Assessment
- Appendix C - Habitats Directive Assessment
- Appendix D - Multi Criteria Analysis Assessment
- Appendix E - Strategic Environmental Assessment (2007-2011)
- Appendix F - Strategic Environmental Assessment (2007-2011) Consultation Review
- Appendix G - Strategic Environmental Assessment (2007-2011)
- Project Need Report (February 2015)
- Appendix A - Summary of Demographic Projections
- Appendix B - (WSP) Economic Needs Report
- Appendix C - Water Demand Review
Fact Sheets
Located in Garrynatineel, County Tipperary.
Located in Incha Beg, Birdhill, County Tipperary.
Located in Cloughjordan, County Tipperary.
Located in Birr at Coagh Upper, County Offaly.
Located in Peamount, County Dublin.
172km pipeline from Parteen Basin to Peamount in Co. Dublin.
Including, chambers, valves and kiosks.
Artistic Representation of Infrastructure Sites
Raw Water Intake (RWI)
Artistic Representation of infrastructure site
Raw Water Intake (RWI)
Artistic Representation of infrastructure site
Water Treatment Plant (WTP)
Artistic Representation of infrastructure site
Water Treatment Plant (WTP)
Artistic Representation of infrastructure site
Break Pressure Tank (BPT)
Artistic Representation of infrastructure site
Break Pressure Tank (BPT)
Artistic Representation of infrastructure site
Termination Point Reservoir (TPR)
Artistic Representation of infrastructure site
Termination Point Reservoir (TPR)
Artistic Representation of infrastructure site
Booster Pumping Station (BPS)
Artistic Representation of infrastructure site
Booster Pumping Station (BPS)
Artistic Representation of infrastructure site